Commercial

4 Kingdom Street

Paddington, London

Project overview

4 Kingdom Street forms part of the Paddington Central estate in west London, a large commercial campus of office buildings, public space and leisure accommodation arranged around the Grand Union Canal and the railway approaches into Paddington station. The building provides substantial open-plan office floorplates over ground-floor active frontage, with a composite steel frame supporting long clear spans and a highly serviced office environment.

The structural solution relies on a steel frame with composite metal deck floors, braced and cored stability, and a transfer strategy at low level where the office grid meets the constraints of the site below. Fabricated steelwork of this type demands early resolution of connection detailing, fit-up tolerances and erection sequence, because most of the value and programme risk sits in the workshop and on the crane rather than in the analysis.

Carl contributed to the structural steelwork engineering and delivery of the project while employed at William Hare Group, working within the design and detailing environment that converts consultant intent into fabricated, erectable steelwork.

Project highlights

  • Composite steel-framed commercial office building
  • Long-span open-plan floorplates
  • Constrained central London site
  • Connection design and fabrication interface
  • Erection sequencing and buildability

Project snapshot

Sector
Commercial
Location
Paddington, London
Employer at the time
William Hare Group
Structural form
Structural steel frame with composite metal deck floors.
Engineering services / scope
Structural steelwork engineering, connection design and fabrication support.

Engineering challenge

A dense, logistically constrained central London site adjacent to live rail and canal infrastructure, where long-span office floorplates and tight erection sequencing had to be resolved through steelwork detailing rather than on site.

Prior professional experience

Experience gained while employed at William Hare Group, prior to the formation of Bebbington Engineering Studio Ltd.

Gallery

Some representative imagery is reproduced from public project sources. Copyright remains with the respective photographer or rights holder. Please contact us regarding attribution or removal.

Working on something similar? Discuss it with a Chartered Structural Engineer.

Discuss Your Project →