Short answer
Yes — that is the most common arrangement. BES works alongside architects from feasibility through to construction, providing structural input as the design develops so that spans, beam depths, column positions and foundation constraints are resolved before the scheme is fixed. Early coordination avoids the familiar problem of a beautiful layout that requires an unreasonably deep beam or a column in the middle of a kitchen. BES can be appointed directly by the client or work under the architect's coordination, whichever suits the project.
Branded guidance note, prepared for project records and circulation to your team.
Where structural input helps most
- Feasibility: testing whether an open-plan layout is achievable within the available zone
- Planning stage: confirming that the proposed massing is structurally deliverable
- Technical design: beam depths, column positions, foundation interfaces, service coordination
- Construction: responding to unforeseen conditions on site
How coordination works in practice
- Structural sketches issued back to the architect for incorporation
- Agreed drawing revision control so calculations always match the current layout
- Direct dialogue with the architect on queries rather than through the client
How BES is typically involved
- BES accepts architect-issued drawings in standard formats and returns coordinated structural information.
- Where required, BES attends design team meetings remotely or in person.
- Building control queries are handled directly to save the architect time.
Typical process
- 01Introduction and scope agreement
- 02Review of architectural information
- 03Structural options and feedback
- 04Coordinated design and calculations
- 05Construction support
Common misconceptions
Commonly assumed
“Bringing in an engineer early costs more.”
In practice
Early input usually reduces total cost by preventing redesign and oversized structure.
Commonly assumed
“The architect and engineer must be from the same practice.”
In practice
Independent appointments are normal and often give the client better value.
Related tools and services
Resource Centre tool
Structural Project Navigator
Answer a few straightforward questions to identify the likely structural engineering input, information requirements and next steps for your project.
Start Project Navigator →Resource Centre tool
Project Information Builder
A guided ten-step wizard that prepares a complete Project Information Pack — client details, site, scope, programme and documents — ready for quotation and appointment.
Start Information Builder →Related questions
Discuss your project
General guidance only goes so far. Describe your building and what you are planning, and you will receive project-specific advice from a Chartered Structural Engineer.
Discuss Your Project →Next scheduled review August 2027
Disclaimer
Indicative result only. The calculation depends on the assumptions and information entered and does not constitute structural design or professional advice. Do not use the result for construction, procurement, Building Regulations submissions or safety-critical decisions. All results must be independently verified by a suitably qualified structural engineer before being used for design, construction or regulatory purposes. Bebbington Engineering Studio Ltd accepts no responsibility for reliance placed on unverified results.